Слесарь по контрольно-измерительным приборам и автоматике на строительство Балканского потока
Описание
ROHIT VAGHELA
57/D, Subhlaxmi Society, Near Giriraj Society,
New Sama Road, Vadodara, Gujarat, India
Contact No.: +91 7567521642 +91 9426397698.
Work: -
E-mail: rohitvaghela407@gmail.com rohitvaghela2001@yahoo.com
LinkedIn: https://www.linkedin.com/in/vaghela-rohit-5b8b19b0
Skype : rohitvaghela
Career Objectives:
To obtain a position of Engineer or Supervisory Positions.
To pursue a challenging career in the field of Pre- Commissioning, Commissioning and Maintenance, so that I can utilize my knowledge and skill of instrumentation effectively and efficiently in a practical manner in my professional approach.
Personnel Details:
Date of Birth : 12th June 1969
Education : BE Instrumentation – Distance Education, (2015-2019), (EIILM University-Sikkim), IBME- Surat, India.
: Diploma in instrumentation & Control, D. N. Polytechnic,
Ahmadabad, Gujarat, India, 1991-92.
: Instrument Technician, I.T.I. (Industrial Training Institute), Gujarat, India, 1988.
Tech. Qualification : Apprenticeship Training (N.C.V.T.) Instrumentation & Control, Gujarat, India 1991
Passport Details : Z 1738936 Issue: - 04/08/2011 at Ahmadabad Expiry: - 03/08/2021
Computer : MS Office, Internet.
Language Known : English, Hindi, Gujarati
Marital Status : Married
Driving License : India (LMV)
HSE Training History:
▪ H2S/BA Awareness and Escape. (Opito, Maersk Oil, QP, ADNOC/ADCO Approved).
▪ Permit to Work System.
▪ Job Hazard Analyses.
▪ Supervision of Safety and CPR First Aid.
▪ Attend a Training Permit to work (PTW Cert.No. NU/HSE/2018/07/125170) by instructor ADNOC/ADCO, Abu Dhabi, UAE and Petrofac / Aramco KSA.
▪ Tropical Basic Offshore Safety Induction Emergency Training (TBOSIET) Through ENERTECH Qatar. (Opito Approved).
▪ Fire prevention and fire frightening, Personal safety and social responsibilities, Elementary first Aid, Personal Survival Techniques
Experience in Abroad
Extreme Engineering, Vadodara, India. 4 May 2019 To 7 April 2020.
Instrumentation Supervisor (Freelancer).
Witness for Bench & Field Calibration Including F&G Instruments.
Installation and Inspection field instruments, JB's.
Cold/Hot Loop Check & Function Test Performance & witness.
ICS Loop Test & Function Test Performed (SAT).
Pre Commissioning & Commissioning.
Trouble Shooting & Fault Finding.
Vendor Assisting.
Assisting during Start Up.
Routine & Corrective Maintenance Activity.
Profile Middle East - Tecnimont S.p.A - Abu Dhabi 8, March 2018 to 31 March 2019.
I&C commissioning Supervisor (Commissioning Engineering Assistant).
ADNOC, Al Dabb’iya, NEB - (North East Bab) Development phase Onshore/Offshore Project.
Central Processing Plant, Production & Injection Well with Clusters,
Activities Involved for Instruments Installation, Pre-Commissioning, Punch List Clearing, Cold/Hot Loop Check, Commissioning, C&E, Functional Test, Vendor & Client Assisting, Start Up, Trouble Shooting, Corrective-Preventive Maintenance for IPS-FGS-CMS-MPS- Bentley Nevada 3500 DCS - Vibration/Temperature Monitoring System (Machinery Protection System), Pipe Leak Detection System (Atmos Intl), Analyzers & Shelters- Fores Srl, Multiphase Flow Meter -ROXAR/Emerson Process Management Srl, RTU –, ODS-Klockner & Co. - Oil-Gas Custody Metering Skid (Fiscal Metering), OMNI Flow Computers, TERRY FERRARIS-Vega MINITRAC 31, Level Profilers, Endress-Hauser GWR & Non-Contact Level Transmitters, CCS- Compressors Control System, RTUs & DCS.
Compressors: Dresser-Rand, Weir Gabbioneta, Garo (Gardner Denver).
MP- D 14 R 6B – Sr. No: 142683-0401
LP- D 06 R 6B – Sr. No; 142683-0201
HP- D 10 R 6B - Sr. No: 142683-0501
Export Gas D 06 R 6B- SR. No: 142683-0201
Gear Box: Flender Graffenstaden.
Motor: GE
Pumps: Weir Gabbioneta, Garo, Sulzer.
Control System: DCS- Honeywell PKS 200/300., PLC – Honeywell – Allen Bradley.
Sub Station: ABB Controls & GIS (Siemens). – GE – LV/HV & VSD.
Directly Supervised to Subcontractors and Vendors.
Kentech Group. Saudi Arabia, Jizan Regions, Jazan. 27, May 2017 to January 15, 2018.
Instrumentation (I&C, E) Supervisor.
Worked for their ARAMCO - Petrofac project JRTF EPC- 4&5.
Jazan Refinery and Terminal Facilities Project – JI 2018 & JI-2019.
Northern Tank Farm and Loading Arms Facilities & Southern Tank Farm Facilities.
Activities Involved for Construction, Pre-Commissioning, Punch List Clearing, Loop Check, Commissioning for PCS/DCS, ESD, FGS, PLC, Telemetry SCADA, MPS- Vibration Monitoring System (Machine Protection System), Tank Gauging-RTG, LDS Wave Guard-Pipe Tech / Central Monitoring System (Leak Detection System), Alderley -Crude Oil Metering Skid, Flow Computers/Prover, De Watering System, Booster / Crude Transfer Pump’s, Interface Area, Scraper Area, Pig Launcher/Receiver-Inlet & Transfer Manifolds Area, Tank Farm, Mixture Pump’s ETC’s.
For Sub Station: Statron UPS & GE E 9000 Motor Control, Power flex 7000, Allen Bradley Panel View Plus 1000, GE-Intelli Guard G. LV Power Circuit Breaker, GE Protection Automation Control +T MFR- Multifunction Relay SEL-451/787/751 ETC’s.
Supervised to Contractor, Sub Contractor and Vendor’s.
Field Instruments: Foundation Field Bus/Hart Applications.
Control System: Honeywell – PKS-300
Extreme Engineering, Vadodara, India. February 2016 to 3, April 2017.
Instrumentation Supervisor
Witness for Bench & Field Calibration Including F&G Instruments.
Installation and Inspection field instruments, JB's.
Cold/Hot Loop Test & Function Test Performance & witness.
ICS Loop Test & Function Test Performed (SAT).
Trouble Shooting & Fault Finding.
Assisting during Start Up.
Routine & Corrective Maintenance Activity.
Renco Spa. (GE).
I&C, E Supervisor From: 17, May 2015 to 30, December 2015.
Worked for their Ob-Ob Gas Plant - Power Plant, Ebocha Oil Center Gas Gathering, Kwale Gas Injection Unit. For PlantGeria Company Ltd., (Installation, Pre-Commissioning, Commissioning, Start Up, Maintenance (Major & Minor Overhauling).
Daily and Monthly Reports Calibration/Installation/Cable Check, Loop Check, Pre-Commissioning, Commissioning, Start Up, Preventive, Corrective, predictive Maintenance Schedule Major and Minor Inspection.
Coordinate Between Operation and Maintenance Dept’s. To solve problems and fixed fault.
Trouble shooting, effective response to emergency conditions and compliance to safety procedures.
Units For Worked.
Low Pressure Gas Compression:
Driving Equipment: Gas Turbine: GE-NP- PGT5
Driven Equipment: Centrifugal Compressor- GE-NP- BCL 405-BCL 356-BCL306A
Low Pressure Gas Compression:
Driving Equipment: ABB Electric Motor-AMD500M6RABM
Driven Equipment: Reciprocating Compressor- Nuovo Pignone- 2HM/1 SN:6942, 6955, 6956
Compression Booster:
Driving Equipment: Gas Turbine: Nuovo Pignone-MS3002 SN:05668, 05683, 05684
Driven Equipment: Centrifugal Compressor: Nuovo Pignone- 2BCL407A –SN:10930, 109331
M.P.Gas Compression:
Driving Equipment: Gas Turbine: GE-NP-MS 1002B SN:05317, 05318
MS 1002D SN:05701, 05702
Driven Equipment: Centrifugal Compressor: Nuovo Pignone- BCL358 –SN:10934, 10935, 10932, 10933
H.P. Gas Compression Reinjection:
Driving Equipment: Gas Turbine: GE-NP-MS 3002 & PGT10 SN:05346, 05347, 05348
Driven Equipment: Centrifugal Compressor: GE-NP- BCL306A&B SN:10243 ,10244, 10245, 10246, 10247, 10248
Power Generation:
Driving Equipment: Gas Turbine: GE-NP-MS 1002B SN:05319, 05321
Gas Turbine: GE-NP-MS5001 SN:
Driven Equipment: Alternator: Ansaldo-
Alternator: HMA- DG 185ZL-04 SN:
Extraction Propane Chilling (LNG):
Driving Equipment: Gas Turbine: GE-NP-MS 1002D SN: 05617, 05637
Driven Equipment: Centrifugal Compressor: GE-NP-3BCL405 SN:10923, 10924
Ebocha Gas Compressor:
Driving Equipment: ABB Electric Motor-QU500LP6 SN:
Driven Equipment: Reciprocating Compressor-GE-NP-2 HM/1 SN:
Sales Gas Compressor:
Driving Equipment: Peebles Electric Motor-ET 630-2240J, ET-7100-2800J SN:
Scott Electric Motor-
Driven Equipment: Centrifugal Compressor- Demag: 06 MV 01A, 71A SN:
Siemens: 06-MV 7A SN: LC1448, LC1449
LLP Gas Compression:
Driving Equipment: Gas Engine- Cameron, Caterpillar-G399
Driven Equipment: Reciprocating Compressor-Cameron-GE-NP-HM1 SN:
LNG:
Driving Equipment: Expander-Rotoflow
Driven Equipment: Axial Compressor-Rotoflow
Own By NAOC, (Agip / ENI).
DOPET: (Doha petroleum Construction Co. Ltd.,) Qatar Petroleum, Qatar. From: Nov. To Dec. 2014.
Instrument Commissioning Supervisor. (I&E).
Assigned for EPIC for Automation Upgrade Commissioning Works at Fahahil Main Degassing Station, Fahahil North Degassing Station, Fahahil South Degassing Station, /Fahahil Stripping Plant and North Field Injection Station for Qatar Petroleum Project in DUKHAN.
Liaised for Signed Loop Folders.
Control System DELTA V- v-12. PCS, ESD and, CHARMS for SIS.
Foundation Field Bus Applications.
This is one of the largest automation projects in Qatar where in we are migrating existing ABB Bailey into Emerson Delta V with all field Instrumentation.
Duties and Responsibilities.
• Responsible for supervision and monitoring to all contractors.
• Closely monitor and resolved all queries raised by sub-contractors regarding technical non conformities and standards, review all change work as required.
• Assigned to the Commissioning & Start-up group for plant facility commissioning.
Duties included commissioning of all plant instrumentation, and associated
equipment, including all F&G systems, ESD, SIS, PCS Delta V Control system etc.
• Liaise with the QA/QC to ensure the RFI for test reports and NCR are closed out.
• Prepare and review of method statement, Pre-comm. Procedures, checks, tests, mechanical completion of Instruments in line with the P&ID’s, etc..,
• Supervision of that inspection and loop tests are carried out in safe and control manner.
• Supervision of that planning, coordination, execution and follow up of all construction & Pre-comm. activities are done in strict compliance with the specifications.
• Liaise with the construction and commissioning team.
• Attending the minutes of meeting with the client regarding the progress of the work and quality related issues.
• Perform technical tasks assigned by the Commissioning site Leader related to the preparation and execution of the pre-commissioning, commissioning, startup activities. Interface with Construction, Engineering, Procurement Contractor disciplines, construction personnel, vendors and subcontractors.
• Sign off mechanical completion, Pre-comm. tests, check sheets and verify progress database
For Telecommunications. Installed Panel, JB’s and Laid cable (FOC, ETHERNET, COXIAL, Foundation Fieldbus, Profibus, Prefab Cables).
Panel to Panel Cabling (Control-HUB-Servers-Alarm Module-Logic Module-Historian Module ETC’s) & Wiring for plant to plant for Secure, Real-Time flow of Information, Voice, Data and Video to form and within the facility. (TMS).
Telecom Maintenance System.
Network Management System.
Power Supply System.
SCADA Communication
PABX & PHONE System
Internet, entertainment & Video Conference.
PAGA, Siren, CCTV, Access Control System.
Paging & Radio System ETC’s.
.
Resigned from positions Due to an accident of my Wife.
Wood Group GTS / Shanahan Engineering Brunei Darussalam. From: Jan. 2014 to March 2014.
I&C Supervisor
Worked for their Gadong Power Station 2 Project by BPMC. Project: Gadong GT 23, 42 MW Major Outage.
Siemens / TurboCare. S - 14 - 010.
BPMC/E&P/DESC.A/2012/09
GE Frame 6, MS 6001-B, Mark-V. Speedtronics.
Assigned for Dismantle, Overhauling, Calibration of Field Instruments and Cable laying/Testing, Functional Checks, Commissioning, Start Up and Maintenance for Auxiliary (Accessories), Turbine, Generator, Exciter, Fire and Gas System Works (Contracted for Outage Assignments).
Duties and responsibilities.
• Responsible for supervision of our supervisor and monitoring to all contractors.
• Closely monitor and evaluate project progress status, resolved all queries raised by sub-contractors regarding technical non-conformities and standards, review all change work as required.
• Perform technical tasks assigned by the Commissioning Site Leader related to the preparation and execution of the pre-commissioning, commissioning, startup activities. Interface with Construction, Engineering, Procurement Contractor disciplines, construction personnel, vendors and subcontractors
Daelim Indutrial Ltd., Yasref (YERP) Project, Yanbu. KSA. From: April 2013 to Nov 2013
Instrumentation Supervisor
Yanbu Export Refinery Project (YERP) Yasref. ARAMCO
EPC 3 & 4, Gasoline and Hydro Cracker Packages.
Sulfur Recovery Unit, Amin Regeneration Unit, Sour Water Stripper.
Installation, Calibration, SAT, Loop Checks, Pre-COMM, Commissioning for Field Instruments.
Control System: Yokogawa Centum VP, Pro safe RS., Siemens Simatic S7-300. Bentley 3500 DCS, Hart, Foundation Fieldbus Applications.
Duties and Responsibilities.
• Responsible for supervision of our supervisor and monitoring to all contractors.
• Closely monitor and evaluate project progress status, resolved all queries raised by sub-contractors regarding technical non conformities and standards, review all change work as required.
• Assigned to the Commissioning & Start-up group for plant facility commissioning.
Duties included commissioning of all plant instrumentation, and associated
equipment, including all F&G systems (Pro safe),ESD systems , Yokogawa Centum VP system etc.
• Liaise with the QA/QC to ensure the RFI for test reports and NCR are closed out.
• Prepare and review of method statement, Pre-comm. Procedures, checks, tests, mechanical completion of Instruments in line with the P&ID’s, etc..,
• Supervision of that inspection and loop tests are carried out in safe and control manner.
• Supervision of that planning, coordination, execution and follow up of all construction & Pre-COMM activities are done in strict compliance with the specifications.
• Liaise with the construction and commissioning team.
• Attending the minutes of meeting with the client regarding the progress of the work and quality related issues.
• Perform technical tasks assigned by the Commissioning site Leader related to the preparation and execution of the pre-commissioning, commissioning, startup activities. Interface with Construction, Engineering, Procurement Contractor disciplines, construction personnel, vendors and subcontractors.
• Sign off mechanical completion, Pre-comm. tests, check sheets and verify progress database.
A.T.I Ltd. UK. From: 19, January to 28 Feb. 2013.
Total E&P/ Spie Oil & Gas Services Angola.
As Instrumentation Foreman I am Responsible for Maintenance work for their Dalia F.P.S.O., Block-17.
Due to Visa Restrictions for Expatriate Not joined again.
ADCO/NPCC BAB THAMAMA ‘G’ & HABSHAN 2, (1.8 MMBOPD PHASE-1 Project).
Through Al Sultan offshore and onshore Oil/Gas field services, Abu Dhabi, UAE
As a Senior Instrument Commissioning Technician From: 1, September 2011 to 17 October 2012.
Responsible for Testing, Cold - Hot Loop Checking, Functional Test, C&E, Pre-Commissioning commissioning and start - up activities related to the project expansion & Existing Plant.
Central Degassing System, Remote Degassing System & Well Head Control Panel’s (Production & Injections) and water injection Cluster’s Control panels.
Control System for PCS, ESD, F&G, RTU: ABB AC 800M, HI, Xa, and HIMA. (Hart, FF/Profibus Network)
.
Xenergi Oilfield Services, Nigeria from: May 2011 to July 2011
As an Instrument Supervisor
LPG Vaporiser Project, 15 MMSCFD Gas Processing Plant and involved in installation, testing, calibration, loop checking, trouble shooting, Punch list, Pre-commissioning, commissioning for Control System PLC S-5000 and related field instruments.
SBM offshore, through Brunel Energy LLC, Abu Dhabi from: February 2011 to April 2011
Project: “EnCana “Deep Panuke”, offshore production Module.
As an I & C Senior Commissioning Technician
Commissioning work of Control System: Siemens S 7 & Autronica Autosafe IFG, and related field instruments for Process Control & ESD, Fire & Gas System.
SPIE, Oil & Gas Services, Abu Dhabi. From:3 August 2010 to 28 October 2010
Project: Emal, emirates Aluminum Smelter Complex, Al Taweelah.
Client: SNC Lavalin / Worley Parsons (SLWP).
As an I&C Senior Commissioning Technician
Responsible for commissioning activities of 2000 MW power plants project, CCPP, GAS Turbine, HRSG and Steam Turbines from GE Frame 9 - Mark Vie.
Perform commissioning and start-up work prior handover to the client.
Calibration and trouble shooting of process control instruments
Assign to carry out all the loops for the steam and Gas turbines, Control System, Mark Vie.
Maersk Oil Qatar Al Shaheen ‘G’ Off-Shore Platform, through Kvasir International from 3 March 2010 to 21 April 2010
As an Instrument Technician
Maintenance work for E&I, Fire & Gas and field instruments of production platform & Living facilities.
CAIRN ENERGY through Brunel Energy India. From: 1 January 2010 to 30 February 2010
As an Instrument Technician
For commissioning work of Barmer Gas Processing Project, India.
Involved in loop checking cable testing, trouble shooting, Commissioning of Field Instruments with control system (Yokogawa centum).
WAHA Oil Company, Libya (GIALO Field). 5 October 2009 to 30 November 2009
Through Engineering for Technical Oil & Gas Services (ETOS) at Libya.
Senior Instrument Commissioning Technician
Involved in Commissioning and Maintenance Activities (Outage) for Gas Turbine: GE-NP-MS5001-Ansaldo-HMA-DG, Control System Siemens, Fanuc – 90/30.
Shell Petroleum Development Company of Nigeria (SPDC). From: 14 February 2008 to 30 January 2009
Through ALCON Nigeria Limited
Senior I&E Commissioning Technician (Supervisor)
Involved in Construction, Pre-Commissioning, Commissioning and Start-Up Work Activities for their Okoloma Gas Plant project.
Field Bus / Smart Field Instruments and control System Delta-V for PAS, HIMA for SIS.
Fire & Gas System Dragger / Det-Tronics (ISBL / OSBL)
T.S.K.J., Nigeria (KBR), Bony Island, through SEPAM from: 1 July 2007 to 30 November 2007
Senior Instrument Commissioning Technician
For Pre-Commissioning, commissioning work of Nigeria LNG Train-6 project.
Control System Yokogawa I/A and related Field Instruments.
Fire & Gas System Dragger / Det-Tronics (ISBL / OSBL)
Eastern Bechtel, Abu-Dhabi, through UTS KENTZ from: 3 July 2006 to 12 June 2007
Senior Instrument Commissioning Technician
Involved in Installation, Calibration, Cable Test, Cold/Hot Loop Checking, Pre-Commissioning & Commissioning, C&E work for Habshan OGD-III Project. (GASCO).
Control System Honeywell Experian PKS for PCS, ESD, SIS, F&G (Det-Tronics) Field Instruments.
Experience in India:
Modern Petrofills, Gujarat, India from: December 1995 to April 2006
Instrument Technician
Commissioning and Maintenance work of plant, Control System Fisher Rosemount Provox- 5 & Allen Bradley 5/25, SLC-150 PLC’s and Related Field Instruments.
Power Generation, WHRSG, Boiler (SKODA & Thermax).
Videocon Narmada Electronics Ltd., Gujarat, India from: November 1993 to November 1995
Instrument Technician
Commissioning and Maintenance for the Plant with Control System Allen Bradley 5/25, SLC-150 and Related Field Instruments.
I.C.B., Gujarat, India from: September 1991 to December 1991
Instrument Technician
Involved in Commissioning activities for Caprolactam Expansion project in GSFC. India.
Indian Petrochemicals Corporation Ltd., Baroda, Gujarat, India from: April 1990 to April 1991
Instrument Apprenticeship Trainee
Indian Petrochemicals Corporation Ltd. Gujarat, India from: October 1988 to April 1990
On contract through Newton Engineering Company, Baroda, India
Instrument Technician
Involved in Maintenance and Project Expansion.
Professional Skills & Achievement:
▪ 20 + years of cumulative experience in installation, cable test, cold/hot loop checking, pre-commissioning, commissioning, troubleshooting and maintenance of On-shore/Offshore Oil & Gas processing plants, petrochemicals, refinery, water treatment plants, boilers, combine cycle power plants, Turbines. Technical background includes knowledge of all kinds of maintenance in continuous process plants and hands on experience in calibration and all other turn around jobs in process plants. Planning and organizing jobs with technician in risk areas in accordance with work permit and hazardous areas safety regulations. Loop testing, Commissioning & Witnessing of control systems. Well-verse in P & l drawings, Relay logic, Interpret location drawings and Hook-up drawings. Also involved in Hook-up, Pre-startup with production teams.
▪ Calibration Installation, Loop checking and commissioning of Electronics & Pneumatics Instrument as per ISO standard procedure.
▪ Work with latest protocol and solid domain knowledge of handling instrumentation such as: Foundation field Bus and hart communicators & different types of field test equipments.
▪ Having good experience with DCS and PLC system likes a Fisher Rosemount PROVOX PLUS – 5, Honeywell Experian pks C-200., Delta- V (pass) Emerson (Processor-8.4, Controller MD Plus), Allen-Bradly 5/25, 2/16, SLC-150, Foxboro Controller-400-R, 650-R (SCADA), HIMA, AC/DC Drives (ABB Siemens).
▪ Field Instruments of Hart, foundation Field bus and network data transmission applications.
▪ Working with different types of pressure & flow smart transmitter (like Rosemount, Micro motion, Khrone, GE panamatrics, Foxboro, bells instrument, Honeywell, Taylor, Yokogawa) Different types of level transmitters like DP type, Displacer type radar type, Capillary type, Ultrasonic type, Air purge & bubbler types (like Masoneilan, Yokogawa, micro-motion, enders & Hauser, magnetron, ABB). Different types of switches like flow, level, pressure and temperature (like delta, bailey, switzer, danfoss, Ashcroft, sor, KDG, mobery, Baker CAC, Sirco, mercoid and cella). Working with different types of final control element with smart Positioners (like fisher DVC-6000F series, Foxboro eckaradt, Masoneilan, Mesto, PMV etc). I also familiar with different types of motor operated valve (like auma, Drehmo & rotork).
▪ I have knowledge of bench & field calibration by using Druck (DPI-610), Unomate (Trx-2), Emerson source & measuring calibrator, Hart communicators Ametek pressure and Temperature calibrators.
▪ Working with shut down activities like PM jobs calibration, Loop checking, control valve, overhauling & calibration and strock checking etc. Calibration of all types of field instruments such as transmitter, I/P converter, Thermocouple, RTD’s switches and control valves etc.
▪ Challenged to supervise all instrument construction, loop checks and commissioning of plant and instructing construction activities at sites. Accountable for conducting loop checking and commissioning of new installations. Actively involved in calibration, installation and loop check coordination. Planning of all related shutdown activities.
▪ My responsibility includes supervising, installation of instruments, inspection of work quality and mention conformity with project standard & specification.
▪ Also worked on fire & gas system (Dragger, Atex, Sieger, Detcon, Simtronics and Detronics) installation, Loop Checking, Pre-Commissioning, Commissioning with Hima, Tyco F&G & siemens PLC’s.
▪ Works with H2S detectors, flame & fire detectors, smoke detectors, UV&IR sensors, fire alarm hooter & beacon indicator, heat detector, Co, CH4, O2 sensors & detectors, combustion gas detectors, hydro carbon detectors, Fusible Rope & Bulb, Gas tester & gas alert monitors with recognized gas testing systems (SKG).
Declaration:
I, the undersigned, hereby certify that the above given information and particulars are true and accurate to the best of my knowledge.
Rohit Vaghela
25 декабря, 2021
Татьяна
Город
Челябинск
Возраст
56 лет ( 1 августа 2026)
22 марта, 2023
Марина
Город
Челябинск
Возраст
60 лет (15 марта 1966)
29 декабря, 2021
Виктория
Город
Челябинск
Возраст
56 лет ( 1 августа 2026)